£46.95

Springer Planung taktzeitoptimierter flexibler Montagestationen: 133 (IPA-IAO - Forschung und Praxis, 133)

Price data last checked 17 day(s) ago - will refresh soon

View at Amazon

We'll watch every seller, every day. One email when your price arrives.

It has never been this cheap. We have no record of a lower price.

£47 today · cheaper than every other day in the last 3 months

NEW HERE?

Amazon shows you one price. We show you all of them.

Tosheroon watches Amazon prices so you don't have to. Every product on Amazon has a price history — we make it visible. Set the price you'd actually pay, and we'll email you the second it gets there. No app, no account, one email.

WHAT'S ON THIS PAGE

↓ Price chart
when this has been cheap or pricey
↓ Forecast
where the price is heading next
↓ Statistics
all-time high & low, recent range
↑ Price alert
name your number, we'll email you

Price History & Forecast

Grey patches = out of stock. Cheaper = lower on the chart. Hover for exact prices.

Last 74 days · 74 data points (no recent data)

Historical
Generating forecast…
£46.95 £44.60 £45.54 £46.48 £47.42 £48.36 £49.30 26 April 2026 14 May 2026 01 June 2026 19 June 2026 08 July 2026

Price Distribution

Price distribution over 74 days • 1 price levels

Days at Price
74 days 0 19 37 56 74 £47 Days at Price

Price Analysis

Most common price: £47 (74 days, 100.0%)

Price range: £47 - £47

Price levels: 1 different prices over 74 days

Description

In diesem Band wird die Analyse der Taktzeitelemente und Maßnahmen zur Optimierung der Stationstaktzeit in der flexiblen Montage beschrieben. Ausgehend von einem Pflichtenheft wird das Konzept eines rechnergestützten Planungssystems zur Festlegung taktzeitoptimierter flexibler Montagestationen erstellt. Zur Festlegung von Berechnungsvorschriften für Taktzeitelemente wurden Grundlagenuntersuchungen durchgeführt. Die Anwendung der entwickelten Berechnungsvorschriften führt zu einer Berechnungsgenauigkeit der Taktzeit einer flexiblen Montagestation von durchschnittlich ± 7,5 %. Weiterhin wurden Methoden zur im Planungsprozeß integrierten Stationstaktzeitberechnung und Optimierung entwickelt. Abschließend wird die Umsetzung der Erkenntnisse im Planungssystem PRISMA und der Einsatz des Systems an einem praktischen Planungsbeispiel aufgezeigt.

Product Specifications

Format
paperback
Domain
Amazon UK
Release Date
28 March 1989
Listed Since
21 February 2011

Barcode

No barcode data available

Similar Products You Might Like

Montage von Schläuchen mit Industrierobotern: 125 (IPA-IAO - Forschung und Praxis, 125)
95% match

Montage von Schläuchen mit Industrierobotern: 125 (IPA-IAO - Forschung und Praxis, 125)

Springer

£64.93 11 Jul 2026
Ein Planungsverfahren zur Erkennung und Bewältigung von Material- und Kapazitätsengpässen bei mehrstufiger Linienfertigung: 150 (IPA-IAO - Forschung und Praxis, 150)
95% match

Ein Planungsverfahren zur Erkennung und Bewältigung von Material- und Kapazitätsengpässen bei mehrstufiger Linienfertigung: 150 (IPA-IAO - Forschung und Praxis, 150)

Springer

£53.48 09 Jul 2026
Die Montage im flexiblen Produktionsbetrieb: Technik, Organisation, Betriebswirtschaft
95% match

Die Montage im flexiblen Produktionsbetrieb: Technik, Organisation, Betriebswirtschaft

Springer

£48.29 08 Jul 2026
Strukturierte Planung flexibel automatisierter Montagesysteme für flächige Bauteile: 39 (iwb Forschungsberichte, 39)
95% match

Strukturierte Planung flexibel automatisierter Montagesysteme für flächige Bauteile: 39 (iwb Forschungsberichte, 39)

Springer

£64.61 06 Jul 2026
Fertigungsstrukturierung auf der Basis von Teilefamilien: 135 (IPA-IAO - Forschung und Praxis, 135)
95% match

Fertigungsstrukturierung auf der Basis von Teilefamilien: 135 (IPA-IAO - Forschung und Praxis, 135)

Springer

£64.90 15 Jul 2026
Modulares Simulationsmodell für die Abläufe in verketteten Fertigungszellen mit Industrierobotern: 124 (IPA-IAO - Forschung und Praxis, 124)
94% match

Modulares Simulationsmodell für die Abläufe in verketteten Fertigungszellen mit Industrierobotern: 124 (IPA-IAO - Forschung und Praxis, 124)

Springer

£46.99 16 Jul 2026
Advances in Production Management Systems: Innovative and Knowledge-Based Production Management in a Global-Local World: IFIP WG 5.7 International ... and Communication Technology, 438)
94% match

Advances in Production Management Systems: Innovative and Knowledge-Based Production Management in a Global-Local World: IFIP WG 5.7 International ... and Communication Technology, 438)

Springer

£73.08 08 Jul 2026
Advances in Production Management Systems: Innovative and Knowledge-Based Production Management in a Global-Local World: IFIP WG 5.7 International ... and Communication Technology, 439)
94% match

Advances in Production Management Systems: Innovative and Knowledge-Based Production Management in a Global-Local World: IFIP WG 5.7 International ... and Communication Technology, 439)

Springer

£74.74 15 Jul 2026
Precision Assembly in the Digital Age: 8th IFIP WG 5.5 International Precision Assembly Seminar, IPAS 2018, Chamonix, France, January 14―16, 2018, ... and Communication Technology, 530)
94% match

Precision Assembly in the Digital Age: 8th IFIP WG 5.5 International Precision Assembly Seminar, IPAS 2018, Chamonix, France, January 14―16, 2018, ... and Communication Technology, 530)

Springer

£41.24 29 Jun 2026
Advances in Production Management Systems: Innovative and Knowledge-Based Production Management in a Global-Local World: IFIP WG 5.7 International ... and Communication Technology, 440)
94% match

Advances in Production Management Systems: Innovative and Knowledge-Based Production Management in a Global-Local World: IFIP WG 5.7 International ... and Communication Technology, 440)

Springer

£77.59 09 Jul 2026
Dictionary of Production Engineering/Wörterbuch der Fertigungstechnik/Dictionnaire des Techniques de Production Mechanique Vol IV: Assembly/Montage/Assemblage: 4
94% match

Dictionary of Production Engineering/Wörterbuch der Fertigungstechnik/Dictionnaire des Techniques de Production Mechanique Vol IV: Assembly/Montage/Assemblage: 4

Springer

£156.76 20 Jun 2026
Advances in Production Management Systems. The Path to Intelligent, Collaborative and Sustainable Manufacturing: IFIP WG 5.7 International Conference, ... and Communication Technology, 514)
94% match

Advances in Production Management Systems. The Path to Intelligent, Collaborative and Sustainable Manufacturing: IFIP WG 5.7 International Conference, ... and Communication Technology, 514)

Springer

£74.24 06 Jul 2026
Advances in Production Management Systems. The Path to Intelligent, Collaborative and Sustainable Manufacturing: IFIP WG 5.7 International Conference, ... and Communication Technology, 513)
94% match

Advances in Production Management Systems. The Path to Intelligent, Collaborative and Sustainable Manufacturing: IFIP WG 5.7 International Conference, ... and Communication Technology, 513)

Springer

£74.24 06 Jul 2026
Kabelbaummontage mit Industrierobotern: 118 (IPA-IAO - Forschung und Praxis, 118)
93% match

Kabelbaummontage mit Industrierobotern: 118 (IPA-IAO - Forschung und Praxis, 118)

Springer

£64.90 29 Jun 2026
Assembly Line Planning and Control
93% match

Assembly Line Planning and Control

Springer

£81.55 09 Jul 2026
Advances in Production Management Systems. Smart Manufacturing for Industry 4.0: IFIP WG 5.7 International Conference, APMS 2018, Seoul, Korea, August ... and Communication Technology, 536)
93% match

Advances in Production Management Systems. Smart Manufacturing for Industry 4.0: IFIP WG 5.7 International Conference, APMS 2018, Seoul, Korea, August ... and Communication Technology, 536)

Springer

£93.13 11 Jul 2026
Wiley Multi-Agent-Based Production Planning and Control Book
93% match

Wiley Multi-Agent-Based Production Planning and Control Book

Wiley

£118.79 15 Jul 2026
Make-to-Order Assembly Management
93% match

Make-to-Order Assembly Management

Springer

£76.38 29 Jun 2026
Industrial Production Management in Flexible Manufacturing Systems
93% match

Industrial Production Management in Flexible Manufacturing Systems

IGI Global

£191.65 24 Jun 2026
Qualitätsorientierte Entwicklung von Montagesystemen: 115 (iwb Forschungsberichte, 115)
93% match

Qualitätsorientierte Entwicklung von Montagesystemen: 115 (iwb Forschungsberichte, 115)

Springer

£44.39 08 Jul 2026
Springer Advances in Production Management Systems APMS 2016
93% match

Springer Advances in Production Management Systems APMS 2016

Springer

£108.70 16 Jul 2026
Springer Advances in Production Management Systems APMS 2016
93% match

Springer Advances in Production Management Systems APMS 2016

Springer

£107.91 16 Jul 2026
Intelligent Scheduling of Robotic Flexible Assembly Cells (Springer Theses)
93% match

Intelligent Scheduling of Robotic Flexible Assembly Cells (Springer Theses)

Springer

£75.58 06 Jul 2026
Entwicklung eines Systems zur interaktiven Gestaltung und Auswertung von manuellen Montagetätigkeiten in der virtuellen Realität: 273 (IPA-IAO - Forschung und Praxis, 273)
93% match

Entwicklung eines Systems zur interaktiven Gestaltung und Auswertung von manuellen Montagetätigkeiten in der virtuellen Realität: 273 (IPA-IAO - Forschung und Praxis, 273)

Springer

£63.73 08 Jul 2026