£75.68

Springer Make-to-Order Assembly Management

Price data last checked 70 day(s) ago - refreshing...

View at Amazon

Price History & Forecast

Last 21 days • 21 data points (No recent data available)

Historical
Generating forecast...
£75.73 £75.68 £75.69 £75.70 £75.71 £75.72 £75.74 25 January 2026 30 January 2026 04 February 2026 09 February 2026 14 February 2026

Price Distribution

Price distribution over 21 days • 1 price levels

Days at Price
21 days 0 5 11 16 21 £76 Days at Price

Price Analysis

Most common price: £76 (21 days, 100.0%)

Price range: £76 - £76

Price levels: 1 different prices over 21 days

Description

Purchasing .Fabrication Assembly Distribution Figure 1.1: Multi-Level Manufacturing System for Make-to-Order Products specific resources of a type, i.e., a certain machine or a single worker, the determination of the sequence operations are processed on a ma chine, and the assignment of start and finish times to operations. We will modify this framework to be specifically suited for multi level make-to-order manufacturing systems. We assume that the facil ity design issue is settled, i.e., the location and the layout of the facility as well as the capacity ofthe three main resource types of the company are determined. These resource types are the engineering department, the fabrication department, and the assembly department. The engineering department is concerned with the construction of new products as well as the modification and customization of ex isting products. This entails the generation of engineering documents such as blue prints for manufacturing. The capacity of the engineering department is determined by the the count and qualification of engi neers and by the availability of construction devices such as computer aided design (CAD) systems etc.

Product Specifications

Format
paperback
Domain
Amazon UK
Release Date
30 November 2010
Listed Since
01 October 2010

Barcode

No barcode data available