£72.39

Gabler Verlag Lebenszykluskosten alternativer Verfügbarkeitsgarantien im Anlagenbau: 117 (Beiträge zur betriebswirtschaftlichen Forschung, 117)

Price data last checked 20 day(s) ago - will refresh soon

View at Amazon

We'll watch every seller, every day. One email when your price arrives.

This is the most expensive it has ever been. Walk away.

£72 today · previous high £72 · all-time low £72

NEW HERE?

Amazon shows you one price. We show you all of them.

Tosheroon watches Amazon prices so you don't have to. Every product on Amazon has a price history — we make it visible. Set the price you'd actually pay, and we'll email you the second it gets there. No app, no account, one email.

WHAT'S ON THIS PAGE

↓ Price chart
when this has been cheap or pricey
↓ Forecast
where the price is heading next
↓ Statistics
all-time high & low, recent range
↑ Price alert
name your number, we'll email you

Price History & Forecast

Grey patches = out of stock. Cheaper = lower on the chart. Hover for exact prices.

Last 66 days · 66 data points (no recent data)

Historical
Generating forecast…
£72.39 £72.28 £72.30 £72.33 £72.35 £72.38 £72.40 01 May 2026 17 May 2026 02 June 2026 18 June 2026 05 July 2026

Price Distribution

Price distribution over 66 days • 1 price levels

Days at Price
66 days 0 17 33 50 66 £72 Days at Price

Price Analysis

Most common price: £72 (66 days, 100.0%)

Price range: £72 - £72

Price levels: 1 different prices over 66 days

Description

Verfügbarkeitsbestimmte Lifecycle-Garantien sind im Maschinen- und Anlagenbau zunehmend verbreitet. Abnehmer, die sich an den Total Cost of Ownership orientieren, fordern bestimmte Kostengarantien und Verfügbarkeitszusagen. Solche Garantien können jedoch für den Hersteller erfolgskritisch und mit hohen Risiken behaftet sein. Eine fundierte Prognose der Garantiekosten ist damit von besonderer Bedeutung. Für dieses typische Controlling-Problem verbindet Alexander Baumeister betriebswirtschaftliche und technische Lösungsmethoden. Zur Entscheidungsunterstützung im Garantiemanagement modelliert er die Lifecycle-Cost-Wirkungen alternativer garantievertraglicher Ausgestaltungsvarianten sowie konstruktiver und instandhaltungsbezogener Maßnahmen nach der Garantiefestlegung. Das dazu entwickelte Simulationstool kann weitgehend alle für praktische Anwendungsfälle notwendigen Gestaltungsmöglichkeiten flexibel erfassen. Dazu gehören z. B. Garantieoptionen und Regenerationsmerkmale genauso wie Redundanzen, alternative Systemkonfigurationen und unterschiedliche Instandhaltungsstrategien als Maßnahmen zur Verfügbarkeitsbeeinflussung.

Product Specifications

Format
paperback
Domain
Amazon UK
Release Date
24 April 2008
Listed Since
10 July 2008

Barcode

No barcode data available

Similar Products You Might Like

Warranty and Preventive Maintenance for Remanufactured Products: Modeling and Analysis
94% match

Warranty and Preventive Maintenance for Remanufactured Products: Modeling and Analysis

CRC Press

£94.66 03 Jul 2026
New Generation Whole-Life Costing: Property and Construction Decision-Making Under Uncertainty
93% match

New Generation Whole-Life Costing: Property and Construction Decision-Making Under Uncertainty

Routledge

£185.00 18 Jun 2026
Quality, Warranty and Preventive Maintenance: 15 (International Series in Operations Research & Management Science, 15)
93% match

Quality, Warranty and Preventive Maintenance: 15 (International Series in Operations Research & Management Science, 15)

Springer

£107.98 06 Jul 2026
Reliability, Maintenance and Logistic Support: - A Life Cycle Approach
93% match

Reliability, Maintenance and Logistic Support: - A Life Cycle Approach

Springer

£164.00 18 Jun 2026
Warranty Management and Product Manufacture (Springer Series in Reliability Engineering)
93% match

Warranty Management and Product Manufacture (Springer Series in Reliability Engineering)

Springer

£80.77 13 Jul 2026
Life Cycle Costing for Engineers
93% match

Life Cycle Costing for Engineers

CRC Press

£58.99 08 Jul 2026
Determining Optimal Reliability Targets: Engineering Analysis and Simulation of Product Validation Costs and Warranty Data
93% match

Determining Optimal Reliability Targets: Engineering Analysis and Simulation of Product Validation Costs and Warranty Data

LAP Lambert Academic Publishing

£71.00 13 Jul 2026
Maintenance Costs and Life Cycle Cost Analysis
93% match

Maintenance Costs and Life Cycle Cost Analysis

CRC Press

£115.00 13 Jul 2026
Applied Nonparametric Statistics in Reliability (Springer Series in Reliability Engineering)
93% match

Applied Nonparametric Statistics in Reliability (Springer Series in Reliability Engineering)

Springer

£75.40 09 Jul 2026
Maintenance Costs and Life Cycle Cost Analysis
93% match

Maintenance Costs and Life Cycle Cost Analysis

CRC Press

£51.93 02 Jul 2026
RCM3: Risk-Based Reliability Centered Maintenance
93% match

RCM3: Risk-Based Reliability Centered Maintenance

Industrial Press

£69.24 21 Jun 2026
Systems Engineering and Safety: Building the Bridge
93% match

Systems Engineering and Safety: Building the Bridge

CRC Press

£54.00 16 Jul 2026
Systems Engineering and Safety: Building the Bridge
93% match

Systems Engineering and Safety: Building the Bridge

CRC Press

£174.99 18 Jun 2026
Reliability Modelling: A Statistical Approach
93% match

Reliability Modelling: A Statistical Approach

Chapman and Hall/CRC

£94.63 03 Jul 2026
Predictive and Optimised Life Cycle Management: Buildings and Infrastructure
93% match

Predictive and Optimised Life Cycle Management: Buildings and Infrastructure

Routledge

£192.61 01 Jul 2026
Electronic Systems Effectiveness and Life Cycle Costing: 3 (NATO ASI Subseries F:, 3)
93% match

Electronic Systems Effectiveness and Life Cycle Costing: 3 (NATO ASI Subseries F:, 3)

Springer

£78.96 04 Jul 2026
Case Studies in Reliability and Maintenance: 377 (Wiley Series in Probability and Statistics)
93% match

Case Studies in Reliability and Maintenance: 377 (Wiley Series in Probability and Statistics)

Wiley

£93.27 15 Jul 2026
Reliability Modelling: A Statistical Approach
93% match

Reliability Modelling: A Statistical Approach

CRC Press

£174.98 19 Jun 2026
Engineering Reliability and Risk Assessment (Advances in Reliability Science)
93% match

Engineering Reliability and Risk Assessment (Advances in Reliability Science)

Elsevier

£180.00 19 Jun 2026
Reliability and Warranties: Methods for Product Development and Quality Improvement
93% match

Reliability and Warranties: Methods for Product Development and Quality Improvement

CRC Press

£62.31 03 Jul 2026
Systems Lifecycle Cost-Effectiveness: The Commercial, Design and Human Factors of Systems Engineering
93% match

Systems Lifecycle Cost-Effectiveness: The Commercial, Design and Human Factors of Systems Engineering

Routledge

£127.62 02 Jul 2026
Warranty Management and Product Manufacture (Springer Series in Reliability Engineering)
93% match

Warranty Management and Product Manufacture (Springer Series in Reliability Engineering)

Springer

£88.19 13 Jul 2026
Recent Advances in System Reliability: Signatures, Multi-state Systems and Statistical Inference (Springer Series in Reliability Engineering)
93% match

Recent Advances in System Reliability: Signatures, Multi-state Systems and Statistical Inference (Springer Series in Reliability Engineering)

Springer

£84.32 11 Jul 2026
Wertanalyse - das Tool im Value Management (VDI-Buch)
93% match

Wertanalyse - das Tool im Value Management (VDI-Buch)

Springer

£73.51 13 Jul 2026