£146.64

Springer Operations Research in the Airline Industry: 9 (International Series in Operations Research & Management Science, 9)

Price data last checked 54 day(s) ago - refreshing...

View at Amazon

Price History & Forecast

Last 37 days • 37 data points (No recent data available)

Historical
Generating forecast...
£146.64 £130.22 £133.80 £137.38 £140.97 £144.55 £148.13 25 January 2026 03 February 2026 12 February 2026 21 February 2026 02 March 2026

Price Distribution

Price distribution over 37 days • 2 price levels

Days at Price
Current Price
20 days 17 days · current 0 5 10 15 20 £132 £146 Days at Price

Price Analysis

Most common price: £132 (20 days, 54.1%)

Price range: £132 - £146

Price levels: 2 different prices over 37 days

Description

260 2 Crew Legalities and Crew Pairing Repair 264 3 Model and Mathematical Formulation 266 4 Solution Methodology 271 5 Computational Experiences 277 6 Conclusion 285 REFERENCES 286 10 THE USE OF OPTIMIZATION TO PERFORM AIR TRAFFIC FLOW MANAGEMENT Kenneth Lindsay, E. Andrew Boyd, George Booth, and Charles Harvey 287 1 Introduction 288 2 The Traffic Flow Management (TFM) Problem 289 3 Recent TFM Optimization Models 292 4 The Time Assignment Model (TAM) 302 5 Summary and Conclusions 307 REFERENCES 309 11 THE PROCESSES OF AIRLINE SYSTEM OPERATIONS CONTROL Seth C. Grandeau, Michael D. Clarke, and Dennis F.X. Mathaisel 312 1 Introduction 313 2 The Four Phases of Airline Schedule Development 315 The Airline Operations Control Center (OCC) 3 320 4 Analysis of Operational Problems 331 5 Areas For Improvement 352 6 Case Study: PT Garuda Indonesia Airlines 357 REFERENCES 368 12 THE COMPLEX CONFIGURATION MODEL Bruce W. Patty and Jim Diamond 370 1 Introduction 370 Problem Description 2 371 Problem Formulation 3 375 4 Model Implementation 379 ix Contents 383 5 Summary REFERENCES 383 13 INTEGRATED AIRLINE SCHEDULE PLANNING Cynthia Barnhart, Fang Lu, and Rajesh Shenoi 384 1 Introduction 385 2 Fleet Assignment and Crew Pairing Problems: Existing M- els and Algorithms 388 3 An Integrated Approximate Fleet Assignment and Crew Pa- ing Model 393 4 An Advanced Integrated Solution Approach 395 5 Case Study 396 6 Conclusions and Future Research Directions 399 REFERENCES 401 14 AIRLINE SCHEDULE PERTURBATION PROBLEM: LANDING AND TAKEOFF WITH

Product Specifications

Format
paperback
Domain
Amazon UK
Publication Date
02 November 2012
Listed Since
03 March 2013

Barcode

No barcode data available