£38.94

Routledge Integrated Cost-Schedule Risk Analysis

Price data last checked 9 day(s) ago - will refresh soon

View at Amazon

We'll watch every seller, every day. One email when your price arrives.

It has never been this cheap. We have no record of a lower price.

£39 today · cheaper than every other day in the last 2 months

NEW HERE?

Amazon shows you one price. We show you all of them.

Tosheroon watches Amazon prices so you don't have to. Every product on Amazon has a price history — we make it visible. Set the price you'd actually pay, and we'll email you the second it gets there. No app, no account, one email.

WHAT'S ON THIS PAGE

↓ Price chart
when this has been cheap or pricey
↓ Forecast
where the price is heading next
↓ Statistics
all-time high & low, recent range
↑ Price alert
name your number, we'll email you

Price History & Forecast

Grey patches = out of stock. Cheaper = lower on the chart. Hover for exact prices.

Last 45 days · 45 data points (no recent data)

Historical
Generating forecast…
£38.94 £36.99 £37.77 £38.55 £39.33 £40.11 £40.89 01 June 2026 12 June 2026 23 June 2026 04 July 2026 15 July 2026

Price Distribution

Price distribution over 45 days • 1 price levels

Days at Price
45 days 0 11 23 34 45 £39 Days at Price

Price Analysis

Most common price: £39 (45 days, 100.0%)

Price range: £39 - £39

Price levels: 1 different prices over 45 days

Description

Project managers tend to believe their cost estimates - whether they have exceeded budgets in the past or not. It is dangerous to accept the engineering cost estimates, which are often optimistic or unrealistic. Though cost estimates incorporate contingency reserves below-the-line, these estimates of reserves often do not benefit from a rigorous assessment of risk to project costs. Risks to cost come from multiple sources including uncertain project duration, which is often ignored in cost risk analyses. In short, experience shows that cost estimating on projects is rarely successful - cost overruns routinely occur. There are effective ways to estimate the impact on the cost of complex projects from project risks of all types, including traditional cost-type risks and the indirect but often substantial impact from risks usually thought of as affecting project schedules. Integrated cost-schedule risk anlaysis helps us determine how likely the project will go over budget with the current plan, how much contingency reserve is required to achieve a desired level of certainty, and which risks are most important so the project manager can mitigate them and achieve a better result. Integrated Cost-Schedule Risk Analysis provides solutions for these and other challenges. This book follows on from David Hulett's highly-praised Practical Schedule Risk Analysis. It focuses on the way that schedule risk can generate cost risk, and how to handle this relationship. It also applies the Risk Driver Method to the analysis so that you can clearly and transparently identify the key risks, rather than just the most risky cost line items. With detailed worked examples and over 70 illustrations, Integrated Cost-Schedule Risk Analysis offers the definitive guide to this critically important aspect of project management from surely the world's leading commentator.

Product Specifications

Format
paperback
Domain
Amazon UK
Release Date
24 June 2024
Listed Since
16 April 2024

Barcode

No barcode data available