£112.77

About as cheap as it gets — within 5% of the all-time low it hit 3 months ago.

£113 today · all-time low £113 (Jul 2026) · usually £113

Routledge Integrated Cost-Schedule Risk Analysis

View at Amazon

Price History & Forecast

Grey patches = out of stock. Cheaper = lower on the chart. Hover for exact prices.

Last 69 days · 69 data points (no recent data)

Historical
Generating forecast…
£122.08 £111.64 £113.92 £116.20 £118.47 £120.75 £123.03 25 July 2026 11 August 2026 28 August 2026 14 September 2026 01 October 2026
View at Amazon ↗

Price data last checked 22 day(s) ago - will refresh soon

NEW HERE?

Amazon shows you one price. We show you all of them.

Tosheroon watches Amazon prices so you don't have to. Every product on Amazon has a price history — we make it visible. Set the price you'd actually pay, and we'll email you the second it gets there. No app, no account, one email.

WHAT'S ON THIS PAGE

↑ Price chart
when this has been cheap or pricey
↑ Forecast
where the price is heading next
↓ Statistics
all-time high & low, recent range
↑ Price alert
name your number, we'll email you

Price Distribution

Price distribution over 69 days • 2 price levels

Days at Price
Current Price
51 days · current 18 days 0 13 26 38 51 £113 £122 Days at Price

Price Analysis

Most common price: £113 (51 days, 73.9%)

Price range: £113 - £122

Price levels: 2 different prices over 69 days

Description

Project managers tend to believe their cost estimates - whether they have exceeded budgets in the past or not. It is dangerous to accept the engineering cost estimates, which are often optimistic or unrealistic. Though cost estimates incorporate contingency reserves below-the-line, these estimates of reserves often do not benefit from a rigorous assessment of risk to project costs. Risks to cost come from multiple sources including uncertain project duration, which is often ignored in cost risk analyses. In short, experience shows that cost estimating on projects is rarely successful - cost overruns routinely occur. There are effective ways to estimate the impact on the cost of complex projects from project risks of all types, including traditional cost-type risks and the indirect but often substantial impact from risks usually thought of as affecting project schedules. Integrated cost-schedule risk anlaysis helps us determine how likely the project will go over budget with the current plan, how much contingency reserve is required to achieve a desired level of certainty, and which risks are most important so the project manager can mitigate them and achieve a better result. Integrated Cost-Schedule Risk Analysis provides solutions for these and other challenges. This book follows on from David Hulett's highly-praised Practical Schedule Risk Analysis. It focuses on the way that schedule risk can generate cost risk, and how to handle this relationship. It also applies the Risk Driver Method to the analysis so that you can clearly and transparently identify the key risks, rather than just the most risky cost line items. With detailed worked examples and over 70 illustrations, Integrated Cost-Schedule Risk Analysis offers the definitive guide to this critically important aspect of project management from surely the world's leading commentator.

Product Specifications

Format
hardcover
Domain
Amazon UK
Release Date
28 May 2011
Listed Since
14 February 2011

Barcode

No barcode data available