£476.09

New to our records — first sighting 23 days ago. We'll learn its rhythm.

23 days of data · current price £476

nuie SBATH07 ǀ Modern Bathroom B Shaped Left Hand Curved Bath, Screen and Panel, 1700mm x 900mm x 415mm, White

View at Amazon

Price History & Forecast

Grey patches = out of stock. Cheaper = lower on the chart. Hover for exact prices.

Last 4 days · 4 data points (no recent data)

Historical
Generating forecast…
£476.09 £452.29 £461.81 £471.33 £480.85 £490.37 £499.89 30 September 2026 30 September 2026 01 October 2026 02 October 2026 03 October 2026
View at Amazon ↗

White, SBATH07

Price data last checked 20 day(s) ago - will refresh soon

NEW HERE?

Amazon shows you one price. We show you all of them.

Tosheroon watches Amazon prices so you don't have to. Every product on Amazon has a price history — we make it visible. Set the price you'd actually pay, and we'll email you the second it gets there. No app, no account, one email.

WHAT'S ON THIS PAGE

↑ Price chart
when this has been cheap or pricey
↑ Forecast
where the price is heading next
↓ Statistics
all-time high & low, recent range
↑ Price alert
name your number, we'll email you

Price Distribution

Price distribution over 4 days • 1 price levels

Days at Price
4 days 0 1 2 3 4 £476 Days at Price

Price Analysis

Most common price: £476 (4 days, 100.0%)

Price range: £476 - £476

Price levels: 1 different prices over 4 days

Description

Save space without comprimising on style with this B-Bath, Bath, Front Panel and Screen set. The crisp white finish of this bath creates a cool and calming feel in any bathroom. Relax and unwind as you soak away the worries of the day with this stunning B-bath. The sleek minimal design, crisp white finish and a larger showering area, will fit perfectly into any bathroom design. The bath screen is designed and manufactured to the highest quality from 6mm toughened safety glass, with a contemporary chrome finish.

Key Features

Save space without comprimising on style with this B-Bath, Bath, Front Panel and Screen set. The crisp white finish of this bath creates a cool and calming feel in any bathroom.

Relax and unwind as you soak away the worries of the day with this stunning B-bath. The sleek minimal design, crisp white finish and a larger showering area, will fit perfectly into any bathroom design.

The bath screen is designed and manufactured to the highest quality from 6mm toughened safety glass, with a contemporary chrome finish.

DIMENSIONS: L: 1695mm, W: 900mm, D: 415mm

5 Years manufacturers guarantee

Product Specifications

Brand
nuie
Model
SBATH07
Colour
White
Size
1700mm
Domain
Amazon UK
Listed Since
28 April 2021

Barcode

No barcode data available

Similar Products You Might Like

nuie Pacific Modern Matt Black Bath Screen - 785 x 1435mm
98% match

nuie Pacific Modern Matt Black Bath Screen - 785 x 1435mm

nuie

£147.72 03 Sep 2026
nuie NBA710 1700mm x 750mm Square Shower Bath - White
98% match

nuie NBA710 1700mm x 750mm Square Shower Bath - White

nuie

£242.87 14 Oct 2026
nuie SBATH13 Modern Bathroom L Shape Square Shower Bath Set with Screen and Front Panel - Left Hand, 1600 x 850 x 390mm, White/Chrome
98% match

nuie SBATH13 Modern Bathroom L Shape Square Shower Bath Set with Screen and Front Panel - Left Hand, 1600 x 850 x 390mm, White/Chrome

nuie

£391.99 08 Sep 2026
nuie SBATH14 L-Shape Shower Bath Set - 1600 x 850mm White
98% match

nuie SBATH14 L-Shape Shower Bath Set - 1600 x 850mm White

nuie

£473.99 13 Sep 2026
nuie SBATH16 L-Shape Square Shower Bath Set - 1800x850mm
98% match

nuie SBATH16 L-Shape Square Shower Bath Set - 1800x850mm

nuie

£435.85 13 Sep 2026
nuie SBATH15 L-Shape Square Shower Bath Set - 1800 x 850mm
98% match

nuie SBATH15 L-Shape Square Shower Bath Set - 1800 x 850mm

nuie

£528.63 13 Sep 2026
Nuie WBP1785L ǀ Modern Bathroom P Shaped Single Ended Shower Bath Left Hand, 1700mm x 850mm x 4520mm, White, 1700mm
97% match

Nuie WBP1785L ǀ Modern Bathroom P Shaped Single Ended Shower Bath Left Hand, 1700mm x 850mm x 4520mm, White, 1700mm

nuie

£150.00 02 Oct 2026
VeeBath Jade 6mm Sail Edge Toughened Safety Glass Bath Screen Glass Shower Door Chrome - 1400x800mm
97% match

VeeBath Jade 6mm Sail Edge Toughened Safety Glass Bath Screen Glass Shower Door Chrome - 1400x800mm

VeeBath

£49.32 28 Aug 2026
nuie NBA308 Barmby Modern Bathroom Single Ended Round Straight Shower Bath, 1675mm x 700mm, White
97% match

nuie NBA308 Barmby Modern Bathroom Single Ended Round Straight Shower Bath, 1675mm x 700mm, White

nuie

£239.96 04 Oct 2026
nuie NSBS3 Pacific 1400mm L-Shaped Double Hinged Bath Screen
97% match

nuie NSBS3 Pacific 1400mm L-Shaped Double Hinged Bath Screen

nuie

Price unavailable
Hudson Reed NBB003 Bella | Modern Bathroom Double Ended Freestanding Bath with Free Push Button Waste, 1495mm x 720mm, White
97% match

Hudson Reed NBB003 Bella | Modern Bathroom Double Ended Freestanding Bath with Free Push Button Waste, 1495mm x 720mm, White

Hudson Reed

Price unavailable
nuie Arno 1700mm Square Shower Bath Front Panel - Blue
97% match

nuie Arno 1700mm Square Shower Bath Front Panel - Blue

nuie

£109.99 10 Sep 2026
Nuie NSSR2 Pacific 1400mm Bath Screen - 6mm Toughened Glass
97% match

Nuie NSSR2 Pacific 1400mm Bath Screen - 6mm Toughened Glass

nuie

£227.37 13 Oct 2026
nuie MPD3031 Arno Modern Bathroom Square Shower Bath End Panel, 700mm, Bleached Oak Woodgrain
97% match

nuie MPD3031 Arno Modern Bathroom Square Shower Bath End Panel, 700mm, Bleached Oak Woodgrain

nuie

£52.95 15 Sep 2026
VeeBath Opal 1400mm Curved Bi-Panel Bath Screen - Chrome
97% match

VeeBath Opal 1400mm Curved Bi-Panel Bath Screen - Chrome

VeeBath

Price unavailable
nuie BPR1407 Modern Bathroom Straight Bath Front Panel and Plinth, 560 x 1795 x 36mm, Satin Anthracite
97% match

nuie BPR1407 Modern Bathroom Straight Bath Front Panel and Plinth, 560 x 1795 x 36mm, Satin Anthracite

nuie

£99.95 03 Oct 2026
nuie BPR1405 Modern Bathroom Straight Bath Front Panel and Plinth, 560 x 1695 x 36mm, Satin Anthracite
97% match

nuie BPR1405 Modern Bathroom Straight Bath Front Panel and Plinth, 560 x 1695 x 36mm, Satin Anthracite

nuie

£89.95 03 Sep 2026
EMKE 100 x 140 cm Foldable Bathtub Shower Screen - Black
97% match

EMKE 100 x 140 cm Foldable Bathtub Shower Screen - Black

EMKE

£180.38 12 Sep 2026
Hudson Reed MPC2605 Havana Modern Bathroom Straight Shower Bath Front Panel & Plinth, 1700mm, Matt Metallic Slate
97% match

Hudson Reed MPC2605 Havana Modern Bathroom Straight Shower Bath Front Panel & Plinth, 1700mm, Matt Metallic Slate

Hudson Reed

£89.95 25 Aug 2026
nuie MPD507N Anthracite Woodgrain Bath Front Panel and Plinth
97% match

nuie MPD507N Anthracite Woodgrain Bath Front Panel and Plinth

nuie

£142.27 02 Sep 2026
VeeBath Linx 1600mm Front Bath Panel Set - White PVC
97% match

VeeBath Linx 1600mm Front Bath Panel Set - White PVC

VeeBath

£74.95 11 Sep 2026
nuie BPR105W Gloss White Bath Front Panel - 1700mm
97% match

nuie BPR105W Gloss White Bath Front Panel - 1700mm

nuie

Price unavailable
nuie MPD605N Charcoal Black Woodgrain Bath Front Panel
97% match

nuie MPD605N Charcoal Black Woodgrain Bath Front Panel

nuie

£112.95 03 Sep 2026
nuie BPR111W Bath Panels Modern Bathroom Waterproof Shower Bath End Panel, 700mm, Gloss White
97% match

nuie BPR111W Bath Panels Modern Bathroom Waterproof Shower Bath End Panel, 700mm, Gloss White

nuie

£44.99 05 Sep 2026