£299.36

Total Productive Maintenance [DVD]

Price data last checked 52 day(s) ago - refreshing...

View at Amazon

We'll watch every seller, every day. One email when your price arrives.

It has never been this cheap. We have no record of a lower price.

£299 today · cheaper than every other day in the last 3 months

NEW HERE?

Amazon shows you one price. We show you all of them.

Tosheroon watches Amazon prices so you don't have to. Every product on Amazon has a price history — we make it visible. Set the price you'd actually pay, and we'll email you the second it gets there. No app, no account, one email.

WHAT'S ON THIS PAGE

↓ Price chart
when this has been cheap or pricey
↓ Forecast
where the price is heading next
↓ Statistics
all-time high & low, recent range
↑ Price alert
name your number, we'll email you

Price History & Forecast

Grey patches = out of stock. Cheaper = lower on the chart. Hover for exact prices.

Last 39 days • 39 data points (No recent data available)

Historical
Generating forecast...
£299.36 £284.39 £290.38 £296.37 £302.35 £308.34 £314.33 13 March 2026 22 March 2026 01 April 2026 10 April 2026 20 April 2026

Price Distribution

Price distribution over 39 days • 1 price levels

Days at Price
39 days 0 10 20 29 39 £299 Days at Price

Price Analysis

Most common price: £299 (39 days, 100.0%)

Price range: £299 - £299

Price levels: 1 different prices over 39 days

Description

This program demonstrates how predictive and preventive maintenance techniques can bring an end to crisis maintenance. The video shows how TPM keeps equipment operating at design specs, and gets more output from smaller facilities. A case study at Delco Remy shows how increases in productivity were gained through teamwork, training, and a sophisticated Computerized Maintenance Management System. A second case study at Loran Cassettes and Audio Products shows how a small manufacturer who is a Q-1 certified supplier, successfully executes TPM techniques. Since implementing its TPM program in mid-1990, daily downtime fell by 29%, daily defects decreased by 22%, and production increased by 20%. The last case study is at Miller Brewery's Packaging Plant where a reliability engineer on staff is responsible for identifying and eliminating recurring problems through equipment redesign or modification.

Product Specifications

Format
dvd
Domain
Amazon UK
Release Date
15 April 1992
Listed Since
12 June 2008

Barcode

No barcode data available