£42.00

It has never been this cheap. We have no record of a lower price.

£42 today · cheaper than every other day in the last 3 months

Manutenção Produtiva Total no Sistema de Produção: Desenvolvimento de uma nova metodologia para a implementação da TPM

View at Amazon

Price History & Forecast

Grey patches = out of stock. Cheaper = lower on the chart. Hover for exact prices.

Last 54 days · 54 data points (no recent data)

Historical
Generating forecast…
£42.00 £39.90 £40.74 £41.58 £42.42 £43.26 £44.10 23 July 2026 05 August 2026 18 August 2026 31 August 2026 14 September 2026
View at Amazon ↗

Price data last checked 37 day(s) ago - refreshing...

NEW HERE?

Amazon shows you one price. We show you all of them.

Tosheroon watches Amazon prices so you don't have to. Every product on Amazon has a price history — we make it visible. Set the price you'd actually pay, and we'll email you the second it gets there. No app, no account, one email.

WHAT'S ON THIS PAGE

↑ Price chart
when this has been cheap or pricey
↑ Forecast
where the price is heading next
↓ Statistics
all-time high & low, recent range
↑ Price alert
name your number, we'll email you

Price Distribution

Price distribution over 54 days • 1 price levels

Days at Price
54 days 0 14 27 41 54 £42 Days at Price

Price Analysis

Most common price: £42 (54 days, 100.0%)

Price range: £42 - £42

Price levels: 1 different prices over 54 days

Description

Este livro investiga os requisitos de implementação da Manutenção Produtiva Total (TPM) num sistema de produção com o objetivo de aumentar a produtividade e a disponibilidade do equipamento; Explorando os pilares e ferramentas da TPM e analisando os requisitos de implementação para cada um deles, Diagnosticando as actividades actuais de produção e manutenção na (fábrica Al-Forat) para a linha de produção (No. cinco) como um estudo de caso na Companhia de Bagdade para refrigerantes, Especificando o desvio das actividades de produção para melhorar a disponibilidade do equipamento e aumentar a produtividade, Desenvolvendo metodologia para a implementação da TPM na linha de produção acima mencionada. A versão do software OEE (13.1) é também utilizada para revelar dados pormenorizados (dia a dia), por ordem de turnos, que melhorarão a tomada de decisões a todos os níveis de gestão.

Product Specifications

Format
paperback
Domain
Amazon UK
Release Date
28 October 2024
Listed Since
30 October 2024

Barcode

No barcode data available

Similar Products You Might Like

MODELO DE OPTIMIZAÇÃO MULTI-CRITÉRIO PARA A PROGRAMAÇÃO ESTRATÉGICA DA MANUTENÇÃO
82% match

MODELO DE OPTIMIZAÇÃO MULTI-CRITÉRIO PARA A PROGRAMAÇÃO ESTRATÉGICA DA MANUTENÇÃO

£60.00 15 Sep 2026
TPM - A Route to World-Class Performance: A Route to World Class Performance
81% match

TPM - A Route to World-Class Performance: A Route to World Class Performance

Newnes

£95.00 08 Aug 2026
Practical TPM: Successful Equipment Management at Agilent Technologies
80% match

Practical TPM: Successful Equipment Management at Agilent Technologies

Routledge

£62.33 30 Aug 2026
Melhoria da produtividade da indústria de manufactura indiana através da TQM: Implementação da Gestão da Qualidade Total (TQM) em PMEs de produção indianas para melhoria da produtividade
80% match

Melhoria da produtividade da indústria de manufactura indiana através da TQM: Implementação da Gestão da Qualidade Total (TQM) em PMEs de produção indianas para melhoria da produtividade

£53.00 14 Sep 2026
Avaliação da eficiência económica dos sistemas de informação e dos projectos informáticos: Métodos modernos, especificação e investimentos em inovações de TI
78% match

Avaliação da eficiência económica dos sistemas de informação e dos projectos informáticos: Métodos modernos, especificação e investimentos em inovações de TI

£60.00 14 Sep 2026
Planeamento e Controlo da Produção: Melhoria do controlo da produção numa empresa de equipamentos de movimentação de terras e cargas
78% match

Planeamento e Controlo da Produção: Melhoria do controlo da produção numa empresa de equipamentos de movimentação de terras e cargas

Novas Edições Acadêmicas

£49.00 14 Sep 2026
Computer-aided Maintenance: Methodologies and Practices: 5 (Manufacturing Systems Engineering Series, 5)
78% match

Computer-aided Maintenance: Methodologies and Practices: 5 (Manufacturing Systems Engineering Series, 5)

Springer

£111.17 05 Aug 2026
Maintenance, Modeling and Optimization
78% match

Maintenance, Modeling and Optimization

Springer

£146.61 05 Aug 2026
System Design Optimization for Product Manufacturing
78% match

System Design Optimization for Product Manufacturing

Springer

£75.68 05 Aug 2026
Computer-aided Maintenance: Methodologies and Practices: 5 (Manufacturing Systems Engineering Series, 5)
78% match

Computer-aided Maintenance: Methodologies and Practices: 5 (Manufacturing Systems Engineering Series, 5)

Springer

£121.55 07 Aug 2026
MODÈLE D'OPTIMISATION MULTICRITÈRE POUR LA PLANIFICATION STRATÉGIQUE DE LA MAINTENANCE
78% match

MODÈLE D'OPTIMISATION MULTICRITÈRE POUR LA PLANIFICATION STRATÉGIQUE DE LA MAINTENANCE

£60.00 14 Sep 2026
Análise e concepção de um Sistema de Gestão de Qualidade
77% match

Análise e concepção de um Sistema de Gestão de Qualidade

£58.00 13 Sep 2026
Monitoring and Evaluation of Production Processes: An Analysis of the Automotive Industry
77% match

Monitoring and Evaluation of Production Processes: An Analysis of the Automotive Industry

Springer

£88.19 07 Aug 2026
Sistema de Gestão da Manutenção para Pequenas Empresas Baseado na WCM: Desenvolvimento de Um Sistema de Gestão da Manutenção para Pequenas Empresas Baseado na World Class Maintenance (WCM)
77% match

Sistema de Gestão da Manutenção para Pequenas Empresas Baseado na WCM: Desenvolvimento de Um Sistema de Gestão da Manutenção para Pequenas Empresas Baseado na World Class Maintenance (WCM)

Novas Edições Acadêmicas

£49.00 13 Sep 2026
Quality and Reliability of Technical Systems: Theory, Practice, Management
77% match

Quality and Reliability of Technical Systems: Theory, Practice, Management

Springer

£109.99 07 Aug 2026
Gestão do desempenho através do PMO: Princípios, implementação e ferramentas
77% match

Gestão do desempenho através do PMO: Princípios, implementação e ferramentas

£50.00 27 Aug 2026
Estudo abrangente sobre a melhoria das máquinas de planejamento
77% match

Estudo abrangente sobre a melhoria das máquinas de planejamento

£40.00 08 Sep 2026
Optimization of Manufacturing Processes (Springer Series in Advanced Manufacturing)
77% match

Optimization of Manufacturing Processes (Springer Series in Advanced Manufacturing)

Springer

£104.08 30 Aug 2026
Gestão da manutenção: Fundamentos e práticas para a qualidade total
77% match

Gestão da manutenção: Fundamentos e práticas para a qualidade total

£85.99 10 Sep 2026
Termografia Infravermelha e Gestão de Ativos: Uma abordagem prática para o Setor Elétrico Brasileiro
77% match

Termografia Infravermelha e Gestão de Ativos: Uma abordagem prática para o Setor Elétrico Brasileiro

Novas Edições Acadêmicas

£49.00 14 Sep 2026
Retenção do conhecimento no processo de desenvolvimento de sistemas: avaliação em três empresas do setor
77% match

Retenção do conhecimento no processo de desenvolvimento de sistemas: avaliação em três empresas do setor

Novas Edições Acadêmicas

£49.00 14 Sep 2026
Reliability-Centered Maintenance: Management and Engineering Methods
77% match

Reliability-Centered Maintenance: Management and Engineering Methods

Springer

£76.78 30 Aug 2026
Transition Towards Energy Efficient Machine Tools (Sustainable Production, Life Cycle Engineering and Management)
77% match

Transition Towards Energy Efficient Machine Tools (Sustainable Production, Life Cycle Engineering and Management)

Springer

£74.91 18 Aug 2026
A implantação do Sistema de Manufatura Enxuta em um Processo Produtivo: Pedro Augusto da Cunha
77% match

A implantação do Sistema de Manufatura Enxuta em um Processo Produtivo: Pedro Augusto da Cunha

Novas Edições Acadêmicas

£47.00 11 Sep 2026