£55.00

It has never been this cheap. We have no record of a lower price.

£55 today · cheaper than every other day in the last 3 months

Percepciones de contratistas y consultores sobre las prácticas de gestión de riesgos: en los proyectos de construcción nigerianos

View at Amazon

Price History & Forecast

Grey patches = out of stock. Cheaper = lower on the chart. Hover for exact prices.

Last 54 days · 54 data points (no recent data)

Historical
Generating forecast…
£55.00 £52.25 £53.35 £54.45 £55.55 £56.65 £57.75 23 July 2026 05 August 2026 18 August 2026 31 August 2026 14 September 2026
View at Amazon ↗

Price data last checked 37 day(s) ago - refreshing...

NEW HERE?

Amazon shows you one price. We show you all of them.

Tosheroon watches Amazon prices so you don't have to. Every product on Amazon has a price history — we make it visible. Set the price you'd actually pay, and we'll email you the second it gets there. No app, no account, one email.

WHAT'S ON THIS PAGE

↑ Price chart
when this has been cheap or pricey
↑ Forecast
where the price is heading next
↓ Statistics
all-time high & low, recent range
↑ Price alert
name your number, we'll email you

Price Distribution

Price distribution over 54 days • 1 price levels

Days at Price
54 days 0 14 27 41 54 £55 Days at Price

Price Analysis

Most common price: £55 (54 days, 100.0%)

Price range: £55 - £55

Price levels: 1 different prices over 54 days

Description

El sector nigeriano de la construcción adolece de un malentendido en materia de gestión de riesgos Este estudio pretende investigar las percepciones de contratistas y consultores a la hora de evaluar los factores de riesgo más significativos (en términos de gravedad y asignación), así como las medidas correctoras eficaces utilizadas en los proyectos de construcción nigerianos. Se llevó a cabo una encuesta para recabar datos de los profesionales (contratistas y consultores) del sector sobre un total de 60 factores de riesgo potenciales identificados y clasificados en nueve (9) grupos. Se utilizó el programa 'SPSS' versión 20 para obtener valores de puntuación media que representaran las opiniones actuales de los profesionales de la zona. El análisis de los datos se basó en un análisis descriptivo. Los resultados mostraron que los contratistas percibían los "retrasos en los pagos" como el factor de riesgo más importante, mientras que los consultores consideraban la "adjudicación del diseño a diseñadores no cualificados" como el factor más arriesgado y significativo. Además, los profesionales consideraron que los métodos más eficaces para prevenir riesgos eran "la referencia a proyectos similares" y "el uso de información actualizada sobre el proyecto para obtener datos precisos". Los profesionales nigerianos comprenderán mejor los factores críticos de riesgo y sus repercusiones en los proyectos.

Product Specifications

Format
paperback
Domain
Amazon UK
Release Date
16 June 2024
Listed Since
17 June 2024

Barcode

No barcode data available

Similar Products You Might Like

Accéder aux capacités des entrepreneurs en matière de suivi et de contrôle
82% match

Accéder aux capacités des entrepreneurs en matière de suivi et de contrôle

£49.00 14 Sep 2026
Gestion des risques juridiques et contractuels dans la construction internationale
79% match

Gestion des risques juridiques et contractuels dans la construction internationale

£58.00 13 Sep 2026
Contribuição da Apólice de Seguro em Riscos de Segurança em Estaleiros de Construção
79% match

Contribuição da Apólice de Seguro em Riscos de Segurança em Estaleiros de Construção

£53.00 14 Sep 2026
Risk Avoidance for the Building Team
79% match

Risk Avoidance for the Building Team

Routledge

£128.25 05 Aug 2026
Características Organizacionais e Segurança das Empresas de Construção: Influência das Características Organizacionais nas Práticas de Segurança das Empresas de Construção em Abuja, Nigéria
79% match

Características Organizacionais e Segurança das Empresas de Construção: Influência das Características Organizacionais nas Práticas de Segurança das Empresas de Construção em Abuja, Nigéria

£26.07 27 Aug 2026
Risk Management Practices in Construction: A Global View
79% match

Risk Management Practices in Construction: A Global View

Springer

£96.00 14 Sep 2026
Risk Management Practices in Construction: A Global View
79% match

Risk Management Practices in Construction: A Global View

Springer

£108.01 13 Sep 2026
Gestión estratégica
78% match

Gestión estratégica

£58.00 14 Sep 2026
Managing Project Risk: Best Practices for Architects and Related Professionals
77% match

Managing Project Risk: Best Practices for Architects and Related Professionals

Wiley

£64.77 15 Sep 2026
Risk Management for Engineering Projects: Procedures, Methods and Tools
77% match

Risk Management for Engineering Projects: Procedures, Methods and Tools

Springer

£66.55 05 Aug 2026
Risk Management for Engineering Projects: Procedures, Methods and Tools
77% match

Risk Management for Engineering Projects: Procedures, Methods and Tools

Springer

£48.24 14 Sep 2026
Analyse des retards dans les projets d'infrastructure
77% match

Analyse des retards dans les projets d'infrastructure

£43.00 14 Sep 2026
Managing international growth risks of Finnish construction industry: Business cases of Finnish construction contractors and building product suppliers
77% match

Managing international growth risks of Finnish construction industry: Business cases of Finnish construction contractors and building product suppliers

LAP Lambert Academic Publishing

£65.00 15 Sep 2026
Prácticas de gestión del valor en el sector libio de la construcción
76% match

Prácticas de gestión del valor en el sector libio de la construcción

£49.00 14 Sep 2026
Risk Management for Geotechnical Engineering: Hazard, Risks and Consequences
76% match

Risk Management for Geotechnical Engineering: Hazard, Risks and Consequences

CRC Press

£52.99 16 Oct 2026
Gestion de la construction
76% match

Gestion de la construction

£55.00 14 Sep 2026
Risk Management for Major Public Sector Capital Infrastructure Schemes: A Systems Perspective for Multi-project Environments
76% match

Risk Management for Major Public Sector Capital Infrastructure Schemes: A Systems Perspective for Multi-project Environments

VDM Verlag

£69.00 15 Sep 2026
Occupational Health and Safety in Construction Project Management
76% match

Occupational Health and Safety in Construction Project Management

Routledge

£84.06 05 Aug 2026
Опыт карьерного роста женщин в строительной отрасли Нигерии
76% match

Опыт карьерного роста женщин в строительной отрасли Нигерии

£42.00 14 Sep 2026
Risk Management: With Applications from the Offshore Petroleum Industry (Springer Series in Reliability Engineering)
76% match

Risk Management: With Applications from the Offshore Petroleum Industry (Springer Series in Reliability Engineering)

Springer

£108.01 05 Aug 2026
Cuestiones de inversión en los contratos de petróleo y gas en los países de la OPEP: Nigeria e Irán - Mitigación de riesgos en las transacciones energéticas
76% match

Cuestiones de inversión en los contratos de petróleo y gas en los países de la OPEP: Nigeria e Irán - Mitigación de riesgos en las transacciones energéticas

£49.00 14 Sep 2026
Reducing Project Risk
76% match

Reducing Project Risk

Routledge

£104.43 04 Aug 2026
Occupational Health in the Construction Industry
75% match

Occupational Health in the Construction Industry

£63.60 14 Sep 2026
Segurança nas indústrias de construção: Estudo de caso da Nigéria
75% match

Segurança nas indústrias de construção: Estudo de caso da Nigéria

£43.00 29 Aug 2026