£136.11

CRC Press Establishing the Environmental Flow Regime for the Middle Zambezi River (IHE Delft PhD Thesis Series)

Price data last checked 65 day(s) ago - refreshing...

View at Amazon

Price History & Forecast

Last 26 days • 26 data points (No recent data available)

Historical
Generating forecast...
£136.11 £126.83 £128.85 £130.88 £132.90 £134.93 £136.95 25 January 2026 31 January 2026 06 February 2026 12 February 2026 19 February 2026

Price Distribution

Price distribution over 26 days • 2 price levels

Days at Price
Current Price
23 days 3 days · current 0 6 12 17 23 £128 £136 Days at Price

Price Analysis

Most common price: £128 (23 days, 88.5%)

Price range: £128 - £136

Price levels: 2 different prices over 26 days

Description

Product Description The Middle Zambezi, host to a rich biodiversity, is located in the central part of the Zambezi River Basin which covers eight Southern African Countries. The area is located downstream of three hydropower schemes. In the last decades, the floodplain riparian tree, the Faidherbia albida, vital for the local wild life, has shown a worrying decrease in its regeneration rates. This thesis explores establishing the environmental flow regime for the Middle Zambezi reach in order to minimise the impact of the upstream hydropower schemes on the river environment, using the Faidherbia albida tree as a biological indicator.The research identified that the current dam operations have completely altered the natural hydrological rhythm from pre-Kariba dam dry season flows of 100-200 m3/s increasing to 1,000-1,500 m3/s. The sudden closure of the dam floodgates can be linked to the observed river channel-widening phenomenon. In addition, the Faidherbia albida tree now experiences longer flood residence over the floodplain, making it inaccessible to animals to allow for regeneration. In order to save the F. albida tree, a two-pronged environmental flow regime is proposed of releasing a moderate flood of 5,800 m3/s once in 5 years, for 5 to 6 weeks in the months of February to March, and phasing the spillway gates closure over a period of 3 to 4 weeks to keep the floodplain wet enough until the months of May and June. Phasing of the spillway gate closure would also mitigate the excessive bank erosion. About the Author Elenestina Mwelwa-Mutekenya is a seasoned hydrologist who has worked as an Environmentalist in a hydropower based power company, ZESCO, for over 20 years. Her work includes participation in defining environmental aspects related to water resources management in the regional Southern African Power Pool (SAPP). Her work and participation in the environmental and social impact assessment process has given her a good understanding of pertinent aspects that relate to hydropower development and operation. The research work in the establishment of sustainable environmental flow regime for a hydropower dominated Middle Zambezi has given her a good understanding of important aspects to look for in the proposition of workable hydropower optimisation plans to save the downstream environment of hydropower schemes.

Product Specifications

Format
Hardcover
Domain
Amazon UK
Release Date
30 August 2024
Listed Since
13 December 2019

Barcode

No barcode data available