£89.73

Society for Mining, Metallurgy, and Exploration Slope Stability in Surface Mining 2000

Price data last checked 55 day(s) ago - refreshing...

View at Amazon

Price History & Forecast

Last 36 days • 36 data points (No recent data available)

Historical
Generating forecast...
£92.43 £89.28 £89.97 £90.66 £91.34 £92.03 £92.72 25 January 2026 02 February 2026 11 February 2026 20 February 2026 01 March 2026

Price Distribution

Price distribution over 36 days • 2 price levels

Days at Price
Current Price
32 days · current 4 days 0 8 16 24 32 £90 £92 Days at Price

Price Analysis

Most common price: £90 (32 days, 88.9%)

Price range: £90 - £92

Price levels: 2 different prices over 36 days

Description

As we enter the twenty-first century, mines are being planned to reach depths of more than 1,100 meters, waste rock embankments have surpassed 600 meters in height, tailings dams have reached heights of 200 meters, and heap leach facilities have topped 150 meters. The push toward higher, deeper, and steeper, along with the larger and more productive equipment in use today, continues to test our tools and capabilities. Slope Stability in Surface Mining documents the progressive rise in technical understanding and sophistication in the field. Only be continuously collecting and exchanging information can design concepts, construction methods, monitoring strategies, and reclamation practices keep pace with the times. Slope Stability in Surface Mining creates a common platform on which to base correct, economical, and safe slope design and construction decisions.

Product Specifications

Format
hardcover
Domain
Amazon UK
Release Date
01 December 2000
Listed Since
29 January 2007

Barcode

No barcode data available