We can't find the internet
Attempting to reconnect
Something went wrong!
Hang in there while we get back on track
£87.68
Gulf Professional Publishing Maximizing Machinery Uptime (Volume 5) (Practical Machinery Management for Process Plants, Volume 5)
Price data last checked 55 day(s) ago - refreshing...
Price History & Forecast
Last 36 days • 36 data points (No recent data available)
Price Distribution
Price distribution over 36 days • 1 price levels
Price Analysis
Most common price: £88 (36 days, 100.0%)
Price range: £88 - £88
Price levels: 1 different prices over 36 days
Description
The authors use their decades of experience and draw upon real-world examples to demonstrate that the application of their techniques provides a basis for equipment management, uptime maximization, and reduced maintenance costs. The text explores reliability assessment techniques such as Failure Mode, Effect Analysis, and Fault Tree Analysis of commonly encountered rotating machinery. These are all highly effective techniques that the engineer can apply to maximize uptime and thereby maximize production and profitability. Provides the tools to drastically improve machinery productivity and performance Bridges the gap between the theory of "reliability engineering" and the practical day-to-day measures that lead to machinery uptime Authoritative reference for maximizing the uptime of process equipment
Product Specifications
- Format
- hardcover
- ASIN
- 0750677252
- Domain
- Amazon UK
- Release Date
- 14 October 2006
- Listed Since
- 02 January 2007
Barcode
No barcode data available