Region:
Text search: "Stationery & Office Supplies Presentation Supplies"
Found 81 products
View product details
10PCS Adhesive Metal Plates for Magnets 65mm x 8mm | Ultra-Thin Steel Strips for Phone Case Magnetic Mounting | Strong Hold for Fridge, Vehicle, Garage, Retail Display & Kitchen
10PCS Adhesive Metal Plates for Magnets 65mm x 8mm | Ultra-Thin Steel Strips for Phone Case Magnetic Mounting | Strong Hold for Fridge, Vehicle, Garage, Retail Display & Kitchen
ASIN: B0FQBGJ8N8
•
Brand: Yhsioaklo
•
Amazon UK
£4.26
View product details
VNDUEEY 50 Pack Magnets, 15x3mm Fridge Magnets for Adults, Whiteboard Magnet for Crafts, Notice Board
VNDUEEY 50 Pack Magnets, 15x3mm Fridge Magnets for Adults, Whiteboard Magnet for Crafts, Notice Board
ASIN: B0BQ28D7XC
•
Brand: VNDUEEY
•
Amazon UK
£11.05
View product details
16Pcs Refrigerator Magnets, Magnetic Push Pins, Strong Fridge magnets, Magnetic Thumb Tacks, Whiteboard Magnets, Neodymium Magnets Push Pins-12 x 16 mm.
16Pcs Refrigerator Magnets, Magnetic Push Pins, Strong Fridge magnets, Magnetic Thumb Tacks, Whiteboard Magnets, Neodymium Magnets Push Pins-12 x 16 mm.
ASIN: B09XMJPPDY
•
Brand: Grtard
•
Amazon UK
£11.99
View product details
Fridge Magnets, 16 Pack 12 x 16 mm Black Neodymium Magnetic Push Pins, Strong Whiteboard Magnets, Magnetic Thumb Tacks, Push Pins for Whiteboard, Magnet for Fridge, Office, Map, Photo
Fridge Magnets, 16 Pack 12 x 16 mm Black Neodymium Magnetic Push Pins, Strong Whiteboard Magnets, Magnetic Thumb Tacks, Push Pins for Whiteboard, Magnet for Fridge, Office, Map, Photo
ASIN: B09X78NSVZ
•
Brand: FINDMAG
•
Amazon UK
£9.99
View product details
VIZ-PRO Magnetic Drywipe Whiteboard 90 x 60 cm, Dry Erase White Board with Black Aluminium Frame and Pen Tray
VIZ-PRO Magnetic Drywipe Whiteboard 90 x 60 cm, Dry Erase White Board with Black Aluminium Frame and Pen Tray
ASIN: B086WV92KL
•
Brand: VIZ-PRO
•
Amazon UK
£22.01
View product details
Artcut 4 Pack Magnetic Clips, Scratch-Resistant Fridge Magnets, Colorful Whiteboard Magnets, Magnets for Whiteboard, Strong Magnets, Notice Board Magnets Perfect for Kitchen, Home, Office, School
Artcut 4 Pack Magnetic Clips, Scratch-Resistant Fridge Magnets, Colorful Whiteboard Magnets, Magnets for Whiteboard, Strong Magnets, Notice Board Magnets Perfect for Kitchen, Home, Office, School
ASIN: B0BCQ4ZYLV
•
Brand: Artcut
•
Amazon UK
£4.99
View product details
Cathedral Products | Easy Fix Frameless Dry Erase Board - 35 x 35cm
Cathedral Products | Easy Fix Frameless Dry Erase Board - 35 x 35cm
ASIN: B0CTHZ4RWC
•
Brand: Cathedral Products
•
Amazon UK
£12.99
View product details
Glidesync Smart Board Stand for 55"- 86'' Interactive Whiteboard, Mobile Stand for Smart Whiteboard, Lockable Wheels Black
Glidesync Smart Board Stand for 55"- 86'' Interactive Whiteboard, Mobile Stand for Smart Whiteboard, Lockable Wheels Black
ASIN: B0CXYYRWZV
•
Brand: Glidesync
•
Amazon UK
£612.32
View product details
VEVOR 30"x20" White Cork Board with Linen Surface – Stylish Wall-Mounted Bulletin Board for Home, School, Office – Elegant & Functional Noticeboard
VEVOR 30"x20" White Cork Board with Linen Surface – Stylish Wall-Mounted Bulletin Board for Home, School, Office – Elegant & Functional Noticeboard
ASIN: B0DBVJT7R5
•
Brand: VEVOR
•
Amazon UK
£18.99
View product details
Amazon Basics Aluminum Frame Cork Notice Rectangular Board, 90cm x 60cm, Silver
Amazon Basics Aluminum Frame Cork Notice Rectangular Board, 90cm x 60cm, Silver
ASIN: B075NHVPPN
•
Brand: Amazon Basics
•
Amazon UK
£17.80
View product details
HWSXEEC Electronic Smart Whiteboard Stand - Fits 55 to 85 Inch Whiteboards, with 4 360-Degree Omnidirectional Casters and Fixing Device to Prevent Movement
HWSXEEC Electronic Smart Whiteboard Stand - Fits 55 to 85 Inch Whiteboards, with 4 360-Degree Omnidirectional Casters and Fixing Device to Prevent Movement
ASIN: B0DZ6L181D
•
Brand: HWSXEEC
•
Amazon UK
£609.63
View product details
Magnetic Dry Erase Whiteboard Glass Board for Office, Home, Wall, Glass
Magnetic Dry Erase Whiteboard Glass Board for Office, Home, Wall, Glass
ASIN: B0DJQ9R3GP
•
Brand: STIKTO
•
Amazon UK
£337.82
View product details
DEVELOP Grey Felt Bulletin & Magnetic Dry Erase Combo Board, 36 x 24 Inch Hanging Whiteboard/Grey Felt Bulletin Combination Board with Marker Tray, Pins, Eraser, Markers & Magnets
DEVELOP Grey Felt Bulletin & Magnetic Dry Erase Combo Board, 36 x 24 Inch Hanging Whiteboard/Grey Felt Bulletin Combination Board with Marker Tray, Pins, Eraser, Markers & Magnets
ASIN: B0DS5PY9BW
•
Brand: DEVELOP
•
Amazon UK
£144.60
View product details
Magnetic Glass Writeboard 48"X36" Tempered Glass Dry Erase Boards Wall Mounted Frameless Whiteboard Bulletin Message Boards (White)
Magnetic Glass Writeboard 48"X36" Tempered Glass Dry Erase Boards Wall Mounted Frameless Whiteboard Bulletin Message Boards (White)
ASIN: B0DXK8PYBG
•
Brand: Younuoboard
•
Amazon UK
£296.71
View product details
PPD 100 Sheets A4 Inkjet Premium OHP Acetate Transparency Film - Overhead Projector Film PPD-34-100
PPD 100 Sheets A4 Inkjet Premium OHP Acetate Transparency Film - Overhead Projector Film PPD-34-100
ASIN: B000W4KUVS
•
Brand: PPD
•
Amazon UK
£37.07
View product details
Dragon Touch Calendar, 21.5" Digital Calendar 2025 Family Wall Planner, 1080P Full HD Interactive Touchscreen, Smart Chore Chart and Home Organization, Gift for Busy Families Scheduling
Dragon Touch Calendar, 21.5" Digital Calendar 2025 Family Wall Planner, 1080P Full HD Interactive Touchscreen, Smart Chore Chart and Home Organization, Gift for Busy Families Scheduling
ASIN: B0DYP45B8C
•
Brand: Dragon Touch
•
Amazon UK
£284.49
View product details
VEVOR P6 Colour Programmable LED Flexible Digital Sliding Panel, DIY Display Panel with Custom Text Pattern, Bluetooth App GIF Control, 990 x 412 x 55 mm
VEVOR P6 Colour Programmable LED Flexible Digital Sliding Panel, DIY Display Panel with Custom Text Pattern, Bluetooth App GIF Control, 990 x 412 x 55 mm
ASIN: B0F5Q5PYBZ
•
Brand: VEVOR
•
Amazon UK
£381.00
View product details
Magnetic Whiteboard 90 X 60 cm, Wall Hanging White Board with 10 Colour Magnets, 6 Double Ended Market Pens,Whiteboard Eraser, Drawing Memo Notice Board for Office, School
Magnetic Whiteboard 90 X 60 cm, Wall Hanging White Board with 10 Colour Magnets, 6 Double Ended Market Pens,Whiteboard Eraser, Drawing Memo Notice Board for Office, School
ASIN: B0FGPVL433
•
Brand: Vivo Technologies
•
Amazon UK
Currently out of stock
View product details
Metal Plates for Magnetic Mount, Phone Case Steel Plates, Self-Adhesive Metal Strips for Phone Case Vehicle Craft Room Fridge Science Lab Workshop Retail Display
Metal Plates for Magnetic Mount, Phone Case Steel Plates, Self-Adhesive Metal Strips for Phone Case Vehicle Craft Room Fridge Science Lab Workshop Retail Display
ASIN: B0FLKCBHXK
•
Brand: Generic
•
Amazon UK
£2.49
View product details
40 Pack Extra Strong Magnets 6mm X 3mm, Neodymium Magnet for White Board, Fridge, Pin Board and DIY Picture
40 Pack Extra Strong Magnets 6mm X 3mm, Neodymium Magnet for White Board, Fridge, Pin Board and DIY Picture
ASIN: B07GFK5XFC
•
Brand: walolo
•
Amazon UK
£4.99
View product details
Nobo Impression Pro 1.8 m High Desk Divider, Felt Surface, Red, 1200 x 1000 mm, 1915511
Nobo Impression Pro 1.8 m High Desk Divider, Felt Surface, Red, 1200 x 1000 mm, 1915511
ASIN: B089KBCFJH
•
Brand: Nobo
•
Amazon UK
£99.90
View product details
Amazon Basics Magnetic Whiteboard with Pen Tray, Aluminium Trim and Dry-Wipe Writing Surface, 60 x 45cm (WxH), White
Amazon Basics Magnetic Whiteboard with Pen Tray, Aluminium Trim and Dry-Wipe Writing Surface, 60 x 45cm (WxH), White
ASIN: B077TGBB72
•
Brand: Amazon Basics
•
Amazon UK
£13.75
View product details
KalaMitica - Magnetic Wall Board - Holder for Fridge Magnets - Anthracite Black - 9 x 24 cm
KalaMitica - Magnetic Wall Board - Holder for Fridge Magnets - Anthracite Black - 9 x 24 cm
ASIN: B0C2J5MP7D
•
Brand: KalaMitica
•
Amazon UK
£10.11
View product details
Large Whiteboard, Double Magnetic White Board for Wall, Dry Erase Whiteboard with Calendar for Office Home & School (Black, 72x48 inch)
Large Whiteboard, Double Magnetic White Board for Wall, Dry Erase Whiteboard with Calendar for Office Home & School (Black, 72x48 inch)
ASIN: B0D3LGKBM7
•
Brand: UIFER
•
Amazon UK
£387.59
View product details
PPD Inkjet Premium Clear OHP Acetate Transparency Film/Screen Print Film Instant Dry A4x50 PPD-34-50
PPD Inkjet Premium Clear OHP Acetate Transparency Film/Screen Print Film Instant Dry A4x50 PPD-34-50
ASIN: B07QHXZVD6
•
Brand: PPD
•
Amazon UK
£19.99
View product details
Amazon Basics Magnetic Dry Erase Board, Aluminum Frame, 28 x 35.6 cm, White
Amazon Basics Magnetic Dry Erase Board, Aluminum Frame, 28 x 35.6 cm, White
ASIN: B085PH6Z51
•
Brand: Amazon Basics
•
Amazon UK
£7.42
View product details
Fridge Magnets, 8 Pack 12 x 16 mm Strong Neodymium Magnet Push Pins, Whiteboard Magnets, Magnetic Push Pins for Fridge, Whiteboard, Magnet for Crafts, Photo, Map, Office, DIY
Fridge Magnets, 8 Pack 12 x 16 mm Strong Neodymium Magnet Push Pins, Whiteboard Magnets, Magnetic Push Pins for Fridge, Whiteboard, Magnet for Crafts, Photo, Map, Office, DIY
ASIN: B0B6HBW33S
•
Brand: FINDMAG
•
Amazon UK
£5.99
View product details
Metal Strips for Magnets - 10 Pack Self-Adhesive Steel Plates for Magnetic Mounting, Fridge Adsorption, Phone Case Strips, Science Lab, Craft Room, Garage, Vehicle, Classroom, Retail Display
Metal Strips for Magnets - 10 Pack Self-Adhesive Steel Plates for Magnetic Mounting, Fridge Adsorption, Phone Case Strips, Science Lab, Craft Room, Garage, Vehicle, Classroom, Retail Display
ASIN: B0FPC4WZNP
•
Brand: Generic
•
Amazon UK
£4.49
View product details
ASelected 10 Pack A3 (420 X 297Mm) Foam Board, 5Mm Thick Polystyrene Foam Sheet for Model Making, Mounting Photos, Presentations, Arts and Crafts Projects (Black)
ASelected 10 Pack A3 (420 X 297Mm) Foam Board, 5Mm Thick Polystyrene Foam Sheet for Model Making, Mounting Photos, Presentations, Arts and Crafts Projects (Black)
ASIN: B0D5QK4MZL
•
Brand: ASelected
•
Amazon UK
£8.99
View product details
Wukong Round Strong Magnets 5mm X 2mm | 100 Pack, Mini Extra Strong Magnets, Neodymium Magnet for Whiteboards, Fridge, Crafts, Notice Board or Picture Magnet
Wukong Round Strong Magnets 5mm X 2mm | 100 Pack, Mini Extra Strong Magnets, Neodymium Magnet for Whiteboards, Fridge, Crafts, Notice Board or Picture Magnet
ASIN: B09H2W3TQZ
•
Brand: Wukong
•
Amazon UK
Currently out of stock
View product details
Nobo Melamine Whiteboard, Non-Magnetic, 1800 x 1200mm, Aluminium Trim, Corner Wall Mounting, Includes Whiteboard Pen, Premium Plus, 180 x 120cm, White, 1915171
Nobo Melamine Whiteboard, Non-Magnetic, 1800 x 1200mm, Aluminium Trim, Corner Wall Mounting, Includes Whiteboard Pen, Premium Plus, 180 x 120cm, White, 1915171
ASIN: B08K8TH9HL
•
Brand: Nobo
•
Amazon UK
£127.56
View product details
Nobo Felt Notice Board, 1800 x 1200 mm, Aluminium Trim, Corner Wall Mounting, Premium Plus, Blue, 1915192
Nobo Felt Notice Board, 1800 x 1200 mm, Aluminium Trim, Corner Wall Mounting, Premium Plus, Blue, 1915192
ASIN: B08K8XX3VW
•
Brand: Nobo
•
Amazon UK
£173.87
View product details
Nobo Premium Plus Steel Magnetic Whiteboard – 2700x1200mm, Aluminium Trim, EU Ecolabel Certified, 1915164
Nobo Premium Plus Steel Magnetic Whiteboard – 2700x1200mm, Aluminium Trim, EU Ecolabel Certified, 1915164
ASIN: B08K8XN6S5
•
Brand: Nobo
•
Amazon UK
£383.99
View product details
Nobo Magnetic Steel Whiteboard With Pen Tray, 1800 x 900mm, Slim Trim Frame, InvisaMount Mounting System, Impression Pro, 180 x 90cm, White,1915405
Nobo Magnetic Steel Whiteboard With Pen Tray, 1800 x 900mm, Slim Trim Frame, InvisaMount Mounting System, Impression Pro, 180 x 90cm, White,1915405
ASIN: B08K8XZ8LY
•
Brand: Nobo
•
Amazon UK
£178.39
View product details
Nobo Premium Plus Enamel Magnetic Whiteboard – 1800x1200mm, Aluminium Trim, EU Ecolabel Certified, 1915149
Nobo Premium Plus Enamel Magnetic Whiteboard – 1800x1200mm, Aluminium Trim, EU Ecolabel Certified, 1915149
ASIN: B08K8XZYWW
•
Brand: Nobo
•
Amazon UK
£262.91
View product details
Nobo Enamel Magnetic Whiteboard, 1200 x 900mm, Aluminium Trim, Corner Wall Mounting, Includes Whiteboard Pen Tray, Essence Range, 120 x 90cm, White, 1915453
Nobo Enamel Magnetic Whiteboard, 1200 x 900mm, Aluminium Trim, Corner Wall Mounting, Includes Whiteboard Pen Tray, Essence Range, 120 x 90cm, White, 1915453
ASIN: B08K8YWRNF
•
Brand: Nobo
•
Amazon UK
£120.34
View product details
Nobo Felt Lockable Notice Board With Sliding Glass Door, 18 x A4, Premium Plus, Blue, 1915334
Nobo Felt Lockable Notice Board With Sliding Glass Door, 18 x A4, Premium Plus, Blue, 1915334
ASIN: B08K8YFCY2
•
Brand: Nobo
•
Amazon UK
£554.57
View product details
Nobo Felt Notice Board, 1800 x 1200 mm, Aluminium Trim, Corner Wall Mounting, Premium Plus, Grey, 1915199
Nobo Felt Notice Board, 1800 x 1200 mm, Aluminium Trim, Corner Wall Mounting, Premium Plus, Grey, 1915199
ASIN: B08K8YX212
•
Brand: Nobo
•
Amazon UK
£151.61
View product details
Nobo Enamel Magnetic Whiteboard With Pen Tray, 1800 x 900mm, Slim Trim Frame, InvisaMount Mounting System, Impression Pro, 180 x 90cm, White, 1915398
Nobo Enamel Magnetic Whiteboard With Pen Tray, 1800 x 900mm, Slim Trim Frame, InvisaMount Mounting System, Impression Pro, 180 x 90cm, White, 1915398
ASIN: B08K8ZQKM8
•
Brand: Nobo
•
Amazon UK
£365.97
View product details
Nobo Felt Notice Board, 2400 x 1200 mm, Aluminium Trim, Corner Wall Mounting, Premium Plus, Blue, 1915193
Nobo Felt Notice Board, 2400 x 1200 mm, Aluminium Trim, Corner Wall Mounting, Premium Plus, Blue, 1915193
ASIN: B08K8YZ4N9
•
Brand: Nobo
•
Amazon UK
£144.53
View product details
Nobo Premium Plus Steel Magnetic Whiteboard – 1200x1200mm, Aluminium Trim, EU Ecolabel Certified, 1915157
Nobo Premium Plus Steel Magnetic Whiteboard – 1200x1200mm, Aluminium Trim, EU Ecolabel Certified, 1915157
ASIN: B08K8ZV9VS
•
Brand: Nobo
•
Amazon UK
£111.34
View product details
Nobo Felt Notice Board, 1500 x 1200 mm, Aluminium Trim, Corner Wall Mounting, Premium Plus, Grey, 1915198
Nobo Felt Notice Board, 1500 x 1200 mm, Aluminium Trim, Corner Wall Mounting, Premium Plus, Grey, 1915198
ASIN: B08K8W688W
•
Brand: Nobo
•
Amazon UK
£111.16
View product details
Nobo Felt Notice Board, 1500 x 1200 mm, Aluminium Trim, Corner Wall Mounting, Premium Plus, Blue, 1915191
Nobo Felt Notice Board, 1500 x 1200 mm, Aluminium Trim, Corner Wall Mounting, Premium Plus, Blue, 1915191
ASIN: B08K8XB4TC
•
Brand: Nobo
•
Amazon UK
£111.16
View product details
Nobo Premium Plus Enamel Magnetic Whiteboard – 1800x900mm, Aluminium Trim, EU Ecolabel Certified, 1915148
Nobo Premium Plus Enamel Magnetic Whiteboard – 1800x900mm, Aluminium Trim, EU Ecolabel Certified, 1915148
ASIN: B08K8X54ZD
•
Brand: Nobo
•
Amazon UK
£149.93
View product details
Nobo Enamel Magnetic Whiteboard With Pen Tray, 1500 x 1000mm, Slim Trim Frame, InvisaMount Mounting System, Impression Pro, 150 x 100cm, White, 1915397
Nobo Enamel Magnetic Whiteboard With Pen Tray, 1500 x 1000mm, Slim Trim Frame, InvisaMount Mounting System, Impression Pro, 150 x 100cm, White, 1915397
ASIN: B08K8XMR4P
•
Brand: Nobo
•
Amazon UK
£279.00
View product details
Nobo Ultra Electric Wall & Ceiling Projection Screen, Lightweight Hanging Matte White Projector Surface With Remote Control, 1440 x 1080mm, 1901970
Nobo Ultra Electric Wall & Ceiling Projection Screen, Lightweight Hanging Matte White Projector Surface With Remote Control, 1440 x 1080mm, 1901970
ASIN: B000HEZ6QM
•
Brand: Nobo
•
Amazon UK
£470.75
View product details
Nobo Cork Noticeboard, 1500 x 1200 mm, Aluminium Trim, Corner Wall Mounting, Essence Range, Light Brown, 1915209
Nobo Cork Noticeboard, 1500 x 1200 mm, Aluminium Trim, Corner Wall Mounting, Essence Range, Light Brown, 1915209
ASIN: B08K8Y5H14
•
Brand: Nobo
•
Amazon UK
£115.88
View product details
Nobo Felt Noticeboard, 1800 x 1200 mm, Aluminium Trim, Corner Wall Mounting, Essence Range, Grey, 1915440
Nobo Felt Noticeboard, 1800 x 1200 mm, Aluminium Trim, Corner Wall Mounting, Essence Range, Grey, 1915440
ASIN: B08K8YLFH7
•
Brand: Nobo
•
Amazon UK
£162.37
View product details
Bi-Office Flipchart Tripod Easel Easy with extendable arms, Non Magnetic, Aluminium Frame, Grey, A1 (60 x 85 cm)
Bi-Office Flipchart Tripod Easel Easy with extendable arms, Non Magnetic, Aluminium Frame, Grey, A1 (60 x 85 cm)
ASIN: B000NM9114
•
Brand: Bi-Office
•
Amazon UK
£98.30
View product details
Nobo A3 Sign Holder Display Stand With Snap Frame, Freestanding Poster Frame, Height Adjustable, Portable, Aluminium Trim, Premium Plus, Silver, 1902384
Nobo A3 Sign Holder Display Stand With Snap Frame, Freestanding Poster Frame, Height Adjustable, Portable, Aluminium Trim, Premium Plus, Silver, 1902384
ASIN: B0016IVVRQ
•
Brand: Nobo
•
Amazon UK
£94.21
View product details
Legamaster Premium 7 414000 Magnetic Project Planner for up to 20 People Objects – Framed and Ready to Hang
Legamaster Premium 7 414000 Magnetic Project Planner for up to 20 People Objects – Framed and Ready to Hang
ASIN: B000J6BL6W
•
Brand: Legamaster
•
Amazon UK
£179.05
View product details
Nobo Outdoor Magnetic Lockable Notice Board 6 x A4, Premium Plus, White, 1902578
Nobo Outdoor Magnetic Lockable Notice Board 6 x A4, Premium Plus, White, 1902578
ASIN: B002YO3NA4
•
Brand: Nobo
•
Amazon UK
£174.04
View product details
Durable 5688/00 Function Table with 20 Display Panel System and Information Display Unit, Colour
Durable 5688/00 Function Table with 20 Display Panel System and Information Display Unit, Colour
ASIN: B000KJMCVQ
•
Brand: Durable
•
Amazon UK
£145.01
View product details
Nobo 355 38093 In/Out board with 20 name capacity, EACH
Nobo 355 38093 In/Out board with 20 name capacity, EACH
ASIN: B000LCVPG0
•
Brand: Nobo
•
Amazon UK
£105.00
View product details
Nobo Performance Weekly Planning Board Grid Layout with Magnetic and Drywipe Functionality - 900 x 600 mm
Nobo Performance Weekly Planning Board Grid Layout with Magnetic and Drywipe Functionality - 900 x 600 mm
ASIN: B000O1MFWQ
•
Brand: Nobo
•
Amazon UK
£133.04
View product details
Durable Info Sign A4 | Floor Standing Information Stand | 1.18m in Height | Silver | Ideal for Offices, Conferences, Exhibitions, etc.
Durable Info Sign A4 | Floor Standing Information Stand | 1.18m in Height | Silver | Ideal for Offices, Conferences, Exhibitions, etc.
ASIN: B000MQ94FE
•
Brand: Durable
•
Amazon UK
£149.96
View product details
Bi-Office Maya Combonet Magnetic Notice Board, Aluminium Frame, 1200 x 900 mm
Bi-Office Maya Combonet Magnetic Notice Board, Aluminium Frame, 1200 x 900 mm
ASIN: B000NMAYJW
•
Brand: Bi-Office
•
Amazon UK
£168.59
View product details
Bi-Office MX03001010 Budget Wood Frame Combination Board, Cork And Whiteboard Dry Wipe Memo Board, 60 x 40 cm
Bi-Office MX03001010 Budget Wood Frame Combination Board, Cork And Whiteboard Dry Wipe Memo Board, 60 x 40 cm
ASIN: B000NMAYT2
•
Brand: Bi-Office
•
Amazon UK
£12.47
View product details
Bi-Office Maya Enamel Aluminium Framed Whiteboard 240x120cm
Bi-Office Maya Enamel Aluminium Framed Whiteboard 240x120cm
ASIN: B001ASAYM0
•
Brand: Bi-Office
•
Amazon UK
£353.00
View product details
Nobo Enamel Mobile Dry Wipe Magnetic Whiteboard With Horizontal Pivot (Flips Top To Bottom), Free Standing Mobile Whiteboard On Castor Wheels, With Pen Tray Holder, Magnets & Marker, White, 1901033
Nobo Enamel Mobile Dry Wipe Magnetic Whiteboard With Horizontal Pivot (Flips Top To Bottom), Free Standing Mobile Whiteboard On Castor Wheels, With Pen Tray Holder, Magnets & Marker, White, 1901033
ASIN: B000WV6TYS
•
Brand: Nobo
•
Amazon UK
£440.67
View product details
Durable VARIO® Display Panel Desk Unit | 30 Panels and Tabs in Assorted Colours | Perfect for Storing and Displaying A4 Documents
Durable VARIO® Display Panel Desk Unit | 30 Panels and Tabs in Assorted Colours | Perfect for Storing and Displaying A4 Documents
ASIN: B0013MUBLW
•
Brand: Visiodirect
•
Amazon UK
£104.35
View product details
Post-it Super Sticky Meeting Charts,Value Pack, 6 Pads, 30 Sheets per Pad,635 mm x 762 mm, White Color - for Brainstorming Anywhere and Keeping All Ideas Visible
Post-it Super Sticky Meeting Charts,Value Pack, 6 Pads, 30 Sheets per Pad,635 mm x 762 mm, White Color - for Brainstorming Anywhere and Keeping All Ideas Visible
ASIN: B0018KVD70
•
Brand: Post-it
•
Amazon UK
£125.99
View product details
Cathedral Products 45 x 60cm Magnetic Dry Erase Whiteboard with Aluminium Frame - Can Be Mounted Landscape or Portrait
Cathedral Products 45 x 60cm Magnetic Dry Erase Whiteboard with Aluminium Frame - Can Be Mounted Landscape or Portrait
ASIN: B001VMARUY
•
Brand: Cathedral Products
•
Amazon UK
£16.98
View product details
Q-Connect Self-Adhesive Flipchart Pad A1 30 Sheet (Pack of 2)
Q-Connect Self-Adhesive Flipchart Pad A1 30 Sheet (Pack of 2)
ASIN: B00211Q3KM
•
Brand: Q-Connect
•
Amazon UK
£39.89
View product details
Nobo Felt Lockable Notice Board 9 x A4, Premium Plus, Blue, 1902556
Nobo Felt Lockable Notice Board 9 x A4, Premium Plus, Blue, 1902556
ASIN: B002YO3NAY
•
Brand: Nobo
•
Amazon UK
£200.19
View product details
Nobo Magnetic Lockable Notice Board 8 x A4, Premium Plus, White, 1902559
Nobo Magnetic Lockable Notice Board 8 x A4, Premium Plus, White, 1902559
ASIN: B003CXCDTI
•
Brand: Nobo
•
Amazon UK
£189.68
View product details
Bi-Office Notice Board Maya, Grey Felt, Aluminium Frame, 90 x 60 cm
Bi-Office Notice Board Maya, Grey Felt, Aluminium Frame, 90 x 60 cm
ASIN: B004KE3IPQ
•
Brand: Bi-Office
•
Amazon UK
£33.26
View product details
Quartet Matrix in/Out Board, 11 x 16 Inches, Magnetic, Track Up to 15 Employees (33703)
Quartet Matrix in/Out Board, 11 x 16 Inches, Magnetic, Track Up to 15 Employees (33703)
ASIN: B004I2GF6O
•
Brand: Quartet
•
Amazon UK
£90.70
View product details
Indesign Wpit40i in/Out Board 40 Names - Grey
Indesign Wpit40i in/Out Board 40 Names - Grey
ASIN: B004JFSBJO
•
Brand: Indesign
•
Amazon UK
£108.03
View product details
MAUL MAULsolid Presentation Board, 150 x 120 cm, Foldable Notice Board for Double-Sided Use, Felt Notice Board for Presentation Cards, Push Pins, Board for Office, School, University, Blue
MAUL MAULsolid Presentation Board, 150 x 120 cm, Foldable Notice Board for Double-Sided Use, Felt Notice Board for Presentation Cards, Push Pins, Board for Office, School, University, Blue
ASIN: B004W7GVLY
•
Brand: MAUL
•
Amazon UK
£231.11
View product details
Bi-Office Notice Board Maya, Burgundy Felt, Aluminium Frame, 180 x 120 cm
Bi-Office Notice Board Maya, Burgundy Felt, Aluminium Frame, 180 x 120 cm
ASIN: B004XSLW1G
•
Brand: Bi-Office
•
Amazon UK
£99.11
View product details
Ghent 2"x3" Fabric Bulletin Board w/Wrapped Edge - Beige - Made in The USA
Ghent 2"x3" Fabric Bulletin Board w/Wrapped Edge - Beige - Made in The USA
ASIN: B006SI52O2
•
Brand: Ghent
•
Amazon UK
£345.72
View product details
Show Me SUPERTOUGH Plain Double-Sided Boards, Durable, Double-Thick– A4 Size for Drywipe and Whiteboard Pens – Classroom Set Ideal for Schools and Education (100 Sets), Bulk Box, B/SRP
Show Me SUPERTOUGH Plain Double-Sided Boards, Durable, Double-Thick– A4 Size for Drywipe and Whiteboard Pens – Classroom Set Ideal for Schools and Education (100 Sets), Bulk Box, B/SRP
ASIN: B008DC7D9I
•
Brand: SHOW-ME
•
Amazon UK
£288.22
View product details
Clairefontaine - Ref 93615C - Foam-Backed Adhesive Cardboard (4 Sheets) - 70x100cm Size, Light & Stiff, 10mm Thick - Suitable for Decoration, Model-Making & Framing
Clairefontaine - Ref 93615C - Foam-Backed Adhesive Cardboard (4 Sheets) - 70x100cm Size, Light & Stiff, 10mm Thick - Suitable for Decoration, Model-Making & Framing
ASIN: B009N9PMSY
•
Brand: Clairefontaine
•
Amazon UK
£297.62
View product details
Bi-Office Notice Board Maya, Red Felt, Aluminium Frame, 120 x 120 cm
Bi-Office Notice Board Maya, Red Felt, Aluminium Frame, 120 x 120 cm
ASIN: B00D17HACK
•
Brand: Bi-Office
•
Amazon UK
£103.33
View product details
Bi-Office Whiteboard Maya, Two-Sided Melamine, Plain/Gridded, Aluminium Frame, 240 x 120 cm
Bi-Office Whiteboard Maya, Two-Sided Melamine, Plain/Gridded, Aluminium Frame, 240 x 120 cm
ASIN: B00DCNB8Z8
•
Brand: Bi-Office
•
Amazon UK
£203.24
View product details
Quartet Cork Bulletin Board, 17 x 23 Inches, Home Décor Corkboard, Black Frame (79281)
Quartet Cork Bulletin Board, 17 x 23 Inches, Home Décor Corkboard, Black Frame (79281)
ASIN: B00J31YNZU
•
Brand: Quartet
•
Amazon UK
£88.97
View product details
Bi-Office Earth Trio Magnetic Whiteboard, 90 x 60 cm (Closed), Lacquered Steel Surface, Aluminium Maya Frame
Bi-Office Earth Trio Magnetic Whiteboard, 90 x 60 cm (Closed), Lacquered Steel Surface, Aluminium Maya Frame
ASIN: B00UJALJRE
•
Brand: Bi-Office
•
Amazon UK
£102.64
View product details
Bi-Office Combination Board Maya, Blue Felt/Magnetic, Aluminium Frame, 180 x 120 cm
Bi-Office Combination Board Maya, Blue Felt/Magnetic, Aluminium Frame, 180 x 120 cm
ASIN: B00QNTPZR0
•
Brand: Bi-Office
•
Amazon UK
£156.49
View product details
VIZ-PRO Flipchart Easel Whiteboard, Magnetic Portable Dry Wipe Board 90 x 60 cm, Tripod White Board Height Adjustable
VIZ-PRO Flipchart Easel Whiteboard, Magnetic Portable Dry Wipe Board 90 x 60 cm, Tripod White Board Height Adjustable
ASIN: B014F7INM0
•
Brand: VIZ-PRO
•
Amazon UK
£49.90
View product details
SIGEL GL248 Premium Glass magnetic Board, glossy surface, 130 x 55 cm, easy mounting, Grey - Artverum
SIGEL GL248 Premium Glass magnetic Board, glossy surface, 130 x 55 cm, easy mounting, Grey - Artverum
ASIN: B01CJMUZJW
•
Brand: Sigel
•
Amazon UK
£294.74